GR-DIP-50KGH Dry Ice Pelletizer
GR-DIP-50KGH

GR-DIP-50KGH Dry Ice Pelletizer

On-demand dry ice pellet production from liquid CO₂ — reduce delivery cost and sublimation loss.

Specifications

Production Capacity88–110 lb/hr (40–50 kg/h)
Pellet Sizes3 mm (1/8"), 16 mm (5/8"), 19 mm (3/4")
Dry Ice Density96.8 lb/ft³ (1550 kg/m³)
Conversion Rate≥ 42% (LCO₂ to solid)
Rated Power4 HP (3 kW)
Dimensions39.4" × 19.7" × 39.4"
Net Weight386 lb
VoltageCustomizable to local power standards

Free technical consultation · Industrial quality guaranteed · Worldwide shipping

Shipping & warranty

Shipping & delivery

Equipment and accessories can be shipped internationally. Freight, lead time, customs responsibility, and delivery access are confirmed for the destination and final order configuration.

Read the shipping policy →
Limited warranty

This machine includes a one-year limited warranty from the documented delivery date for verified defects in materials or workmanship. Consumables, wear items, hoses, nozzles, seals, filters, and damage caused by misuse or improper utilities are not covered.

Read the complete warranty policy →
01 · Overview

Built for the work.

GR-DIP-50KGH converts liquid CO₂ (LCO₂) into high-density dry ice pellets on site, giving you fresh media when you need it and reducing dependence on delivery schedules.

High conversion efficiency (≥42%) lowers CO₂ consumption cost. High-density pellets (1550 kg/m³) sublimate more slowly and perform better for blasting and cold-chain use. Supports 3 mm pellets for blasting plus 16 mm and 19 mm for cold-chain and food applications. PLC control for stable, repeatable production.

02 · Applications

Where it performs.

  • Dry ice blasting: 3 mm pellets for compatible blasting systems
  • Cold-chain logistics: pharmaceuticals and perishables
  • Food & beverage: flash chilling
  • Laboratory and R&D: temperature control
03 · Configuration

What’s included.

  • GR-DIP-50KGH pelletizer unit with PLC control
  • Pellet size tooling (confirm die sets at order time)
04 · Planning

Specify before delivery.

Confirm utilities, site access, operating environment, consumables, ventilation, PPE, delivery handling, and local requirements before finalizing the configuration.