GR-FCV-CFG vacuum motor for compatible commercial floor scrubbers
GR-FCV-CFG

GR-FCV-CFG Vacuum Motor

Replacement vacuum motor for compatible floor scrubbers; voltage, airflow interface, mounting, and machine model must be confirmed.

Specifications

Product TypeFloor scrubber vacuum motor
Motor ConfigurationTangential discharge vacuum motor
Selection InputsMachine model, voltage, motor label, stages, discharge, and mounting
CompatibilityConfirm connector, gasket, cooling, dimensions, and control system

Free technical consultation · Industrial quality guaranteed · Worldwide shipping

Shipping & warranty

Shipping & delivery

Equipment and accessories can be shipped internationally. Freight, lead time, customs responsibility, and delivery access are confirmed for the destination and final order configuration.

Read the shipping policy →
Limited warranty

Warranty eligibility is governed by the accepted quotation and applicable manufacturer terms. Consumables, normal wear items, and components depleted or degraded through ordinary use are not covered.

Read the complete warranty policy →
01 · Overview

Built for the work.

The GR-FCV-CFG is a replacement vacuum motor for compatible commercial floor scrubbers. The motor creates the airflow and suction used to recover dirty water from the squeegee assembly into the recovery tank. The supplied image shows a tangential-discharge motor configuration.

Vacuum motors with a similar diameter can differ in voltage, number of stages, fan and discharge arrangement, mounting flange, gasket, overall height, electrical connector, cooling path, and control method. Send the floor-scrubber brand and model, the complete motor label, dimensions, connector photographs, and the existing part reference before ordering.

02 · Applications

Where it performs.

  • Replacement of a failed floor-scrubber recovery vacuum motor
  • Restoring suction after the hose, tank, seals, and squeegee have been checked
  • Maintenance sourcing after voltage and mounting confirmation
03 · Configuration

What’s included.

  • Final scope of supply confirmed in the accepted quotation
04 · Planning

Specify before delivery.

Confirm utilities, site access, operating environment, consumables, ventilation, PPE, delivery handling, and local requirements before finalizing the configuration.

Discuss your application →

Related guidance

Confirm the configuration before quoting.